  • Maintenance

Maintenance & Performance Inspection Division

With the enactment of the Machinery and Equipment Act—covering design and construction standards, the appointment of maintenance managers,
and the mandatory implementation of performance inspections—phased in from April 18, 2021, it has become legally required to verify
whether machinery and equipment installed and operated in buildings and various industrial facilities are being managed in compliance
with prescribed maintenance standards. Our organization inspects and verifies such compliance in order to contribute to public safety
and health, as well as to the efficient use of energy. In addition, we serve as an organization that evaluates the machinery and equipment management
capabilities of maintenance managers appointed by building owners or operators. As stipulated by Presidential Decree, we meet requirements
that exceed those applied to maintenance managers, including higher-level technical personnel and precision inspection equipment.
We are officially registered with the Mayor of a Special Self-Governing City, the Governor of a Special Self-Governing Province, or the relevant Mayor,
County Governor, or District Head, and we conduct statutory performance inspections on behalf of the management entity (owner or manager).

1.Main tasks

1) Acting as an agent for reviewing and confirming the conformity of machinery and equipment standards

A. Check the technical standards of the mechanical equipment design document before the start of the construction of the client
B. Inspection of the suitability of machinery and equipment before use of the construction by the client

2) Performance inspection agency required for mechanical equipment maintenance standards

A. Functional inspection: Appearance · Divided into driving and safety Inspection at least once a quarter
B. Detailed inspection: Regarding the maintenance guidelines, the status table of the machinery and equipment subject to inspection, the functional inspection results, and the review items for the machinery and equipment subject to inspection
      Refer to tax review matters during detailed inspection of machinery and equipment, use 21 types of equipment, and conduct detailed inspections at least once a year.
- Hardware and equipment system review
  (1) Appropriateness of maintenance instructions
  (2) Operating status of the hardware system
  (3) Whether the design value and the measured value on the status table of the inspection target match
- Establish a performance improvement plan
  (1) Aging according to the life of machinery and equipment
  (2) Non-conformities and improvements according to the detailed inspection questionnaire
  (3) Need for performance improvement and detailed improvement plan for each year
- Review of energy usage
  Energy consumption by category, such as cooling and heating

2. Subject to maintenance standards (performance inspection business)

1) Buildings with a total floor area of 10,000 square meters or more among buildings classified by purpose (hereinafter referred to as "buildings by use") classified in accordance with Article 2, Paragraph 2 of the Building Act
       Buildings (excluding apartment houses and warehouse facilities pursuant to Items 2 and 18 of the same paragraph)
2) Apartment houses (hereinafter referred to as "apartment houses") pursuant to Article 2, Paragraph 2, Item 2 of the Building Act that fall under any of the following items:
A. Apartment houses with more than 500 units
B. Apartment houses with more than 300 households with centralized heating (including district heating methods)
3) Articles 14, Paragraph 1, Item 3 of the Machinery and Equipment Act Buildings, etc. designated and notified by the Minister of Land, Infrastructure, Transport and Tourism in consideration of the scale of the buildings, etc.
A. Facilities pursuant to Article 2, Item 1 of the Special Act on Safety and Maintenance of Facilities
B. School facilities in accordance with Article 2, Item 1 of the School Facility Business Promotion Act
C. Underground stations pursuant to Article 3, Paragraph 1, Item 1 of the Indoor Air Quality Management Act (hereinafter referred to as "underground stations") and underground shopping malls pursuant to Paragraph 2 of the same paragraph (hereinafter referred to as "underground malls")
D. Buildings owned or managed by the head of a central administrative agency, the head of a local government, or any other person designated by the Minister of Land, Infrastructure, Transport and Tourism, etc.

3. Mechanical equipment for performance inspection business

1) Heat source and heating and cooling equipment: refrigerator, cooling tower, heat storage (ice storage, heat shrinkage), boiler, heat exchanger, expansion tank, pump (cooling and heating),
     New Energy (Geothermal, Solar, Fuel Cell), Packaged Air Conditioner, Constant Temperature and Humidity
2) Air conditioning equipment: air conditioner, fan coil unit
3) Ventilation equipment: ventilation equipment, filt
4) Sanitary Equipment : Sanitary Equipment
5) Water supply and hot water supply equipment: water pump, hot water tank, water tank and water tank
6) Wastewater and drainage aeration and stormwater drainage equipment: Wastewater and drainage pipes
7) Five Crystal Chemical and Water Recycling Equipment: Sewage Purification Equipment, Water Reuse Equipment
8) Plumbing Fixtures: Piping and Accessories
9) Duct equipment: ducts and accessories
10) Thermal insulation equipment: thermal insulation and accessories
11) Automatic control equipment: automatic control equipment
12) Soundproof, dustproof, and seismic equipment: soundproofing equipment, dustproof equipment, and earthquake-resistant equipment.
13) Facilities in apartment units (at the request of residents): boilers, air conditioners, ventilation equipment, sanitary appliances, plumbing

4. Engineer Capacity

1) Construction Engineers Association [Engineers registered in the Enforcement Decree of the Construction Technology Promotion Act: 19 people
2) Engineering Association [Engineers registered in the Enforcement Decree of the Engineering Industry Promotion Act: 40
3) Maintenance manager according to the Machinery and Equipment Act: 40 people

5. Inspection Equipment

1. Infrared thermal imaging camera

12. Light meter

2. Ultrasonic Flow Meter

13. Rotational Meter (R.P.M Measuring Instrument)

3. Digital pressure gauge

14. Ultrasonic thickness gauge

4. Data Recorder

15. Sonza Caliper

5. Flue gas analyzer

16. Carbon Dioxide (CO2) Meter

6. Dry and wet bulb thermometer

17. Carbon Monoxide (CO) Meter

7. Standard thermometer

18. Fine dust measuring device

8. Infrared thermometer

19. Leak detector

9. Digital anemometer

20. Pipe Endoscope Camera

10. Digital wind pressure gauge

21. Water quality analyzer

11. AC power meter

22. Other

Maintenance Division

[Maintenance Division (Performance Inspection)]

6. Quotation Request Guide

○ Recently, in relation to the operation and management of building mechanical equipment, new mechanical equipment laws and maintenance standards have been established and will be implemented from August 9, 2021.

○ The main content of the law is that the management entity (owner or manager of the machine equipment) must appoint a machine equipment maintenance manager.
      Regular performance inspections of mechanical equipment are required.(See the "Appointment of Machinery Maintenance Manager and Performance Inspection Targets and Timing" section below.)

○ In addition, our company has obtained a permit for mechanical equipment performance inspection (Busan Metropolitan City) to provide the best quality and service for customer satisfaction.
      Based on our extensive experience accumulated over 20 years, we will ensure that you perform your mechanical equipment performance inspection tasks perfectly.

○ If you need to calculate costs for budget reflection or inspection related to machine equipment performance inspection, please request it from our company.
      (If you fill out the machine equipment performance inspection quantity calculation form below), we will calculate the optimal cost and, when performing the performance inspection,
      we will do our best to satisfy our customers by deploying the best technical personnel .

thank you.

● Contact information (GE Engineering Maintenance Business Division Performance Inspection Team)

  • ☏ Team Leader Hwang In-sun (Director): 070-4432-3630 (HP: 010-4542-3151)
  • ☏ Contact: 070-4432-1118
  • ☏ E-mail) geeng@geeng.com | Home Page) www.geeng.com
  • ☏ Headquarters) 503, 12 Beobwon-ro, Yeonje-gu, Busan (Geoje-dong, Rowin Tower)
          TEL) 051-506-6301 | FAX) 051-506-6356
  • ☏ Seoul Office) Room 1003, Building A, Le Meilleur Jongno Town, 19 Jongno, Jongno-gu, Seoul
          TEL / FAX) 02-574-6785

□ Appointment of mechanical equipment maintenance manager and performance inspection target and period (existing buildings)

기계설비 유지관리자 선임 및 성능점검 대상 및 시기 표

□ Machinery Equipment Performance Inspection Quantity Calculation Form  (Click on the table to download the file.)

(☞ If you send us the design drawing and equipment list, we can calculate the exact quantity and cost.)

 기계설비 성능점검 수량 산출서표
  • 1) If drilling, etc. is required to inspect the internal condition of pipes and ducts, the cost will be calculated separately.
  • 2) For machinery and equipment that are not inspected in full quantity during performance inspection, the inspection target should be changed every year to ensure that no machinery or equipment is missed.
         If the machine equipment subject to inspection is one unit (type), a performance inspection must be conducted annually despite the above calculation standards.